Soft Drinks Pouches | Small Business Project

Soft drinks pouches manufacturing project can be initiated as small scale basis. It is important to identify different food beverages and their categories. There are fruit juices,syrups, sherbets, fermented and non fermented beverages, alcoholic beverages, Carbonated and non carbonated beverages, synthetic
juices, that can be introduced as soft drinks pouches. Over the past few decades sales of soft drinks pouches have gone from strength to strength. Most innovations in the soft drinks pouches industries tend to be either related to equipment, packaging or the product itself. The lightweight packaging reduces energy consumption during transportation, and after use all that has to be sent to landfill is one small, flat piece of film.  Soft drinks pouches are like a fashion item, and so the look and design of the product needs to retain authority. The trick is to put value into the brand through the packaging.

Cold drinks are very popular among people of all ages. They are available in canteens, restaurants and hotels. Cold drinks in pouches are nowadays very common. These pouches may be available either as an aerated soft drinks or juice based soft drink. The juice-based consists of nutritious fruit concentrate, carbonated water and sugar. The soft drinks pouches is aimed at busy, active adults as well as children, as the pack does not require a straw.

India exports soft drinks and is the second largest exporter in the world. It has created good international market and also established bottling plants in New York, Kuwait, Oman, UAE, Malaysia, Sharjah etc. The consumption has increased at 17 % per annum and has tremendous prospects for an entrepreneur.

Soft Drinks Pouches Project Synopsis:

Plant Capacity: 5000 pouch per day Working Capital: Rupees 8 Lakhs
Plant & Machinery: Rupees 3 Lakhs  Break Even: 60.34%
Total Capital Investment: Rupees 19 Lakhs Return: 43.22%

 

  • The actual cost of project may deviate on change of any of the assumptions.
  • We can modify the project capacity and project cost as per your requirement.